Estimating and tendering for construction work / (Record no. 24051)

000 -LEADER
fixed length control field 01579nam a2200229 4500
001 - CONTROL NUMBER
control field vtls002378660
003 - CONTROL NUMBER IDENTIFIER
control field MY-SjTCS
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20200306154016.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 110218s1998 enka 001 eng
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 0750634073
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201910021506
Level of effort used to assign nonsubject heading access points ummi
Level of effort used to assign subject headings 201102181451
Level of effort used to assign classification VLOAD
Level of effort used to assign subject headings 200809091802
Level of effort used to assign classification carolineson
Level of effort used to assign subject headings 200809091800
Level of effort used to assign classification carolineson
-- 200407271936
-- VLOAD
082 04 - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 692.5
Item number BRO
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Brook, Martin.
9 (RLIN) 14422
245 10 - TITLE STATEMENT
Title Estimating and tendering for construction work /
Statement of responsibility, etc. Martin Brook
250 ## - EDITION STATEMENT
Edition statement 2nd ed.
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Oxford :
Name of publisher, distributor, etc. Butterworth-Heinemann,
Date of publication, distribution, etc. 1998
300 ## - PHYSICAL DESCRIPTION
Extent xiv, 290 p. :
Other physical details ill. ;
Dimensions 25 cm.
505 0# - FORMATTED CONTENTS NOTE
Formatted contents note Preface. - Acknowledgements. - List of Figures. - Abbreviations Used in the Text. - 1. Organization of the Estimating Function. - 2. Procurement Paths. - 3. Forms of Contract. - 4. Tender Documentation. - 5. Estimating Methods. - 6. Contractor Selection and Decision to Tender. - 7. Project Appreciation. - 8. Enquiries to Suppliers and Sub-Contractors. - 9. Tender Planning and Method Statements. - 10. Resource Costs - Labour, Materials and Plant. - 11. Unit Rate Pricing. - 12. Sub-Contractors and Nominated Suppliers. - 13. Fluctuations. - 14. Provisional Sums and Dayworks. - 15. Preliminaries. - 16. Cashflow Forecasts. - 17. Completing the Estimate and Final Tender Review. - 18. Tender Submission and Results. - 19. Action With the Successful Tender. - 20. Computer-Aided Estimating. - Further Reading. - Index.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Building
General subdivision Estimates.
9 (RLIN) 30537
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Letting of contracts.
9 (RLIN) 205701
920 ## - Programme
Programme BLT(DIP) : 522806, 522807
999 ## - SYSTEM CONTROL NUMBERS (KOHA)
Koha biblionumber 24051
Koha biblioitemnumber 24051
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Permanent Location Current Location Date acquired Total Checkouts Barcode Date last seen Date last checked out Copy number Koha item type Public note Uniform Resource Identifier
          Taylor's Library-TU Taylor's Library-TU 2004-07-27 53 5000029847 2019-12-05 2018-04-05 1 Main Collection SABDx,23002,03,RM  
          Taylor's Library-TU Taylor's Library-TU 2004-07-27 52 5000030108 2019-12-05 2018-07-18 1 Main Collection SABDx,23002,03,RM Floor 4, Shelf 29 , Side 1, TierNo 5, BayNo 4