Project management / (Record no. 51186)

000 -LEADER
fixed length control field 01853cam a2200253 a 4500
001 - CONTROL NUMBER
control field vtls003113655
003 - CONTROL NUMBER IDENTIFIER
control field MY-SjTCS
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20200306164846.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 110218s2007 enka b 001 0 eng
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9780566087721 (pbk.)
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 0566087723 (pbk.)
035 ## - SYSTEM CONTROL NUMBER
System control number 14631905
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201102181420
Level of effort used to assign nonsubject heading access points VLOAD
Level of effort used to assign subject headings 200806261605
Level of effort used to assign classification pushpa
-- 200806231412
-- shuhada
082 04 - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 658.404
Item number LOC
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Lock, Dennis.
9 (RLIN) 22488
245 10 - TITLE STATEMENT
Title Project management /
Statement of responsibility, etc. Dennis Lock.
250 ## - EDITION STATEMENT
Edition statement 9th ed.
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Aldershot, England :
Name of publisher, distributor, etc. Gower,
Date of publication, distribution, etc. c2007.
300 ## - PHYSICAL DESCRIPTION
Extent xxii, 520 p. :
Other physical details ill. ;
Dimensions 25 cm.
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references (p. [503]-505) and index.
505 0# - FORMATTED CONTENTS NOTE
Formatted contents note Introduction to project management -- Factors for project success or failure -- Defining the project task -- Estimating the project costs -- First steps in planning the timescale -- Financial appraisal and the business plan -- Risk -- Project authorization -- Project organization structures -- Organization of management change and IT projects -- Key people in the organization -- Work breakdown and coding -- Completing the breakdown structures -- Detailed planning : an introduction to critical path networks -- Detailed planning : critical path networks in practice -- Principles of resource scheduling -- Scheduling people (and other reusable resources) -- Scheduling materials -- Scheduling cash flows -- Computer applications -- Managing project start-up -- Aspects of commercial management -- Managing procurement -- Managing progress -- Managing changes -- Managing project costs -- Earned-value analysis and cost reporting -- Managing multiple projects, programmes and portfolios -- More advanced or less frequently used techniques -- Managing project closure.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Project management.
9 (RLIN) 255561
920 ## - Programme
Programme BLT(DIP) : 527111, 527112
999 ## - SYSTEM CONTROL NUMBERS (KOHA)
Koha biblionumber 51186
Koha biblioitemnumber 51186
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Permanent Location Current Location Date acquired Total Checkouts Barcode Date last seen Date last checked out Copy number Koha item type Public note Uniform Resource Identifier
          Taylor's Library-TU Taylor's Library-TU 2008-06-23 12 5000032276 2019-12-05 2011-05-23 1 Main Collection SABDx,23002,03,RM  
          Taylor's Library-TU Taylor's Library-TU 2008-06-23 16 5000027968 2019-12-05 2015-07-27 1 Main Collection SABDx,23002,03,RM Floor 4, Shelf 25 , Side 2, TierNo 3, BayNo 6