Normal view MARC view ISBD view

The capability maturity model : guidelines for improving the software process / principal contributors and editors, Mark C. Paulk ... [et al.]

Contributor(s): Paulk, Mark C | Carnegie Mellon University. Software Engineering Institute.
Series: The SEI series in software engineering.Publisher: Reading, Mass : Addison-Wesley, c1994Description: 441 p. ; 24 cm.ISBN: 0201546647.Subject(s): Computer software -- DevelopmentDDC classification: 005.10685
Contents:
Pt. One. The Capability Maturity Model for Software : Background, Concepts, Structure, and Usage. 1. Introducing Software Process Maturity. 2. The Software Process Maturity Framework. 3. The Structure of the Capability Maturity Model. 4. Interpreting the CMM. 5. Using the CMM. 6. A High-Maturity Example : Space Shuttle Onboard Software. - Pt. Two. The Key Practices of the Capability Maturity Model for Software. 7. The Key Areas for Level 2 : Repeatable. 8. The Key Process Areas for Level 3 : Defined. 9. The Key Process Areas doe Level 4 : Managed. 10. The Key Process Areas for Level 5 : Optimizing. - Appendixes. A. References. B. Acronyms. C. Glossary. D. Abridged Version of the Key Practices. E. Mapping the Key Practices to Goals. F. Comparing ISO 9001 and the CMM. G. An Overview of ISO's SPICE Project. H. Change History of the CMM. I. Change Request Form. - Index.
Item type Current location Call number Copy number Status Notes Date due Barcode Remark
Main Collection TU External Storage-LCS
005.10685 CAP (Browse shelf) 1 Available SOCIT, SOCIT, 560413 1000109798 Please fill up online form at https://taylorslibrary.taylors.edu.my/services/external_storage1

Pt. One. The Capability Maturity Model for Software : Background, Concepts, Structure, and Usage. 1. Introducing Software Process Maturity. 2. The Software Process Maturity Framework. 3. The Structure of the Capability Maturity Model. 4. Interpreting the CMM. 5. Using the CMM. 6. A High-Maturity Example : Space Shuttle Onboard Software. - Pt. Two. The Key Practices of the Capability Maturity Model for Software. 7. The Key Areas for Level 2 : Repeatable. 8. The Key Process Areas for Level 3 : Defined. 9. The Key Process Areas doe Level 4 : Managed. 10. The Key Process Areas for Level 5 : Optimizing. - Appendixes. A. References. B. Acronyms. C. Glossary. D. Abridged Version of the Key Practices. E. Mapping the Key Practices to Goals. F. Comparing ISO 9001 and the CMM. G. An Overview of ISO's SPICE Project. H. Change History of the CMM. I. Change Request Form. - Index.