000 | 01535nam a2200241 4500 | ||
---|---|---|---|
001 | vtls002172260 | ||
003 | MY-SjTCS | ||
005 | 20200306153747.0 | ||
008 | 110218s2000 njua 001 eng | ||
020 | _a013674821X | ||
039 | 9 |
_a201909181747 _bummi _c201102181253 _dVLOAD _y200407271927 _zVLOAD |
|
082 | 0 | 4 |
_a658.23 _bMEY |
100 | 1 |
_aMeyers, Fred E. _913341 |
|
245 | 1 | 0 |
_aManufacturing facilities design and material handling / _cFred E. Meyers, Matthew P. Stephens |
260 |
_aUpper Saddler River, N.J. : _bPrentice Hall, _cc2000 |
||
300 |
_axv, 415 p. : _bill. ; _c25 cm. |
||
505 | 0 | _aCh. 1. Introduction to Manufacturing Facilities Design and Material Handling. - Ch. 2. Sources of Information for Manufacturing Facilities Design. - Ch. 3. Time Study. - Ch. 4. Process Design. - Ch. 5. Flow Analysis Techniques. - Ch. 6. Activity Relationship Analysis. - Ch. 7. Ergonomics and Workstation Design Space Requirement. - Ch. 8. Auxiliary Services Requirement Space. - Ch. Employee Services - Space Requirements. - Ch. 10. Material Handling. - Ch. 11. Material Handling Equipment. - Ch. 12. Office Layout Techniques and Space Requirements. - Ch. 13. Area Allocation. - Ch. 14. Facilities Design -- The Layout. - Ch. 15. Application of Computer Simulation and Modeling. - Ch. 16. Selling the Layout. - Answers. - Index. | |
650 | 0 |
_aMaterials handling. _9202373 |
|
650 | 0 |
_aPlant layout. _913342 |
|
650 | 0 |
_aProduction engineering. _96460 |
|
700 | 1 |
_aStephens, Matthew P. _e(j.a.) _9202374 |
|
920 | _aENG(UOS) : 31554 | ||
999 |
_c21592 _d21592 |