000 01191cam a2200229 a 4500
001 vtls003023191
003 MY-SjTCS
005 20200306162855.0
008 110218s1999 enka 001 0 eng
020 _a0727727362
039 9 _a201102181439
_bVLOAD
_c200507210916
_dkusuma
_c200507121117
_dmalathy
_y200507111605
_zfadilah
082 0 4 _a624.068
_bHOL
100 1 _aHolroyd, Trevor M.
_9223152
245 1 0 _aSite management for engineers /
_cTrevor M. Holroyd.
260 _aLondon :
_bT. Telford,
_c1999.
300 _axii, 275 p. :
_bill. ;
_c24 cm.
504 _aIncludes bibliographical references.
505 _a1. The tender.- 2. Health and Safety.- 3. Construction techniques.- 4. Materials.- 5. Plant, Equipment and tools.- 6. Labour and Staff.- 7. Sub-Contractors.- 8. Planning and Organization.- 9. Resourcing the work, setting up systems, setting out.- 10. Controlling cost, quality and progress.- 11. Managing and developing the team and yourself.- 12. Relationships.- 13. Meetings.- 14. Getting paid and paying.- Endnote.- Useful documents.
650 0 _aConstruction industry
_xManagement.
_98145
650 0 _aProduction scheduling.
_9223153
920 _aBLT (DIP) : 524356
999 _c37128
_d37128