000 | 00822cam a2200241 a 4500 | ||
---|---|---|---|
001 | vtls003210884 | ||
003 | MY-SjTCS | ||
005 | 20200306165854.0 | ||
008 | 110218s2007 okua b 001 0 eng | ||
020 | _a9781593700720 (hbk.) | ||
020 | _a1593700725 (hbk.) | ||
039 | 9 |
_a201104190917 _bpushpa _c201102181739 _dVLOAD _y201009271544 _zmalathy |
|
082 | 0 | 4 |
_a622.3381 _bAZA 2007 |
100 | 1 |
_aAzar, Jamal J., _d1937- _940872 |
|
245 | 1 | 0 |
_aDrilling engineering / _cJ.J. Azar, G. Robello Samuel. |
260 |
_aTulsa, Okla. : _bPennWell Corp., _cc2007. |
||
300 |
_ax, 486 p. : _bill. ; _c24 cm. |
||
504 | _aIncludes bibliographical references (p. [454]-471) and index. | ||
650 | 0 |
_aOil well drilling. _940873 |
|
650 | 0 |
_aGas well drilling. _940874 |
|
700 | 1 |
_aSamuel, G. Robello. _9274524 |
|
920 | _aENG : 152402 | ||
999 |
_c58511 _d58511 |