Normal view MARC view ISBD view

Basic estimating for construction / James A.S. Fatzinger.

By: Fatzinger, James A. S.
Publisher: Upper Saddle River, N.J. : Pearson / Prentice Hall, c2004Edition: 2nd ed.Description: xi, 363 p. : ill. ; 28 cm + 1 CD-ROM (4 3/4 in.) + 29 plans.ISBN: 0131119133 (pbk.); 9780131119130 (pbk.).Subject(s): Building -- EstimatesDDC classification: 692.5
Contents:
1. Estimating procedures - 2. Estimating mathematics - 3. Efficiency and productivity - 4. Earthwork - 5. Concrete - 6. Masonry - 7. Structural and miscellaneous steel - 8. Wood and plastics: doors and windows - 9. Thermal and moisture protection - 10. Finishes - 11. Specialty divisions - 12. Mechanical and plumbing - 13. Electrical - 14. The BID package, contract, and follow-up - Appendix I: The plan center concept - Appendix II: Abbreviations, symbols, and basic mathematical tables - Appendix III: The contract documents - Appendix IV: Project manual - Appendix V: Basic tables relating to the construction divisions - Index.
Item type Current location Shelf location Call number Copy number Status Notes Date due Barcode
Main Collection Taylor's Library-TU

Floor 4, Shelf 29 , Side 1, TierNo 1, BayNo 5

692.5 FAT (Browse shelf) 1 Available SABDx,23002,03,AD 5000043698
Accompanying Material (Media Resource) Taylor's Library-TU
692.5 FAT (Browse shelf) 1 Available SABDx,23002,03,AD 1001011340
Accompanying Material (Media Resource) Taylor's Library-TU
692.5 FAT (Browse shelf) 1 Available SABDx,23002,03,AD 1001003521
Main Collection Taylor's Library-TU

Floor 4, Shelf 29 , Side 1, TierNo 1, BayNo 5

692.5 FAT (Browse shelf) 1 Available SABDx,23002,03,AD 5000027920

Includes index.

"Includes plans that kept in the workroom".

1. Estimating procedures - 2. Estimating mathematics - 3. Efficiency and productivity - 4. Earthwork - 5. Concrete - 6. Masonry - 7. Structural and miscellaneous steel - 8. Wood and plastics: doors and windows - 9. Thermal and moisture protection - 10. Finishes - 11. Specialty divisions - 12. Mechanical and plumbing - 13. Electrical - 14. The BID package, contract, and follow-up - Appendix I: The plan center concept - Appendix II: Abbreviations, symbols, and basic mathematical tables - Appendix III: The contract documents - Appendix IV: Project manual - Appendix V: Basic tables relating to the construction divisions - Index.